4
Active Jobs
↑ 2 from last week
3
Pending Acceptance
⚡ Respond within 2h
2
Jobs Today
On schedule
7
Upcoming Jobs
Next 14 days
142
Completed Jobs
98.6% success
₹84K
Payment Released
This month
₹12K
Pending Settlement
Processing
4.8
Performance Rating
Top 5% this region
0
Warnings/Penalties
Clean record ✓
Active Jobs
4 Running
#01
Bridge Reinforcement – Sector 7
ACTIVE
#02
Pipeline Inspection – Zone B
ACTIVE
#03
Foundation Survey – Plot 22
PENDING
#04
Road Resurfacing – Block C
UPCOMING
Today's Timeline
On Track
06:30 AM
Check-in & Equipment Verification
All tools confirmed. JCB-4 operational.
08:00 AM
Job #01 Commenced – Bridge Sector 7
Before photos uploaded. Work ongoing.
02:00 PM
Progress Update Submission
Upload daily progress report.
05:00 PM
Completion Confirmation – Job #01
After photos + sign-off required.
06:30 PM
Equipment Return & Sign-off
Machinery handover to depot.
Job Acceptance System
3 Pending Response
⚡ Auto-Penalty Countdown — Job #03
01:47:33
Respond before timeout or auto-penalty applies
#JOB-2024-03 · Foundation Survey – Plot 22
Assigned 45 minutes ago · Expires in 1h 47m
⚡ URGENT
Location
📍 New Township, Block 22, Plot Row F
Scheduled Date
📅 Feb 26, 2026 · 08:00 AM
Equipment Required
🔧 Survey Drone, Total Station, JCB Mini
Estimated Duration
⏱ 6–8 Hours
#JOB-2024-04 · Excavation – Commercial Complex
Assigned 2 hours ago · Expires in 3h 15m
PENDING
Location
📍 CBD Zone, Tower C Site
Date
📅 Feb 27, 2026 · 07:30 AM
Job Execution Panel
Job #01 Active
Work Details
Job ID
#JOB-2024-01
Category
Civil Structure
Priority
HIGH
Client
NHAI Division 3
Required Materials
• M40 Grade Concrete — 24 cubic meters
• TMT Steel Bars 32mm — 1.2 tonnes
• Shuttering Plates — 80 sq.ft
• Binding Wire — 15 kg
• TMT Steel Bars 32mm — 1.2 tonnes
• Shuttering Plates — 80 sq.ft
• Binding Wire — 15 kg
Required Equipment
• JCB 3DX Backhoe (Unit #JCB-4) ✅
• Transit Mixer (Unit #TM-12) ✅
• Vibrator Needle (Handheld) ✅
• Transit Mixer (Unit #TM-12) ✅
• Vibrator Needle (Handheld) ✅
Attendance Entry
Location Map
📍
NH-48 · Bridge Sector 7
Before / After Photos
Before Work
Upload Before
After Work
Upload After
Daily Progress Update
65%
Availability Management
Currently Available
Availability Status
Mark as Available
Visible to coordinators for job assignment
Machine #JCB-4 Operational
Backhoe Loader – Unit JCB-4
Machine #TM-12 Operational
Transit Mixer
Leave Request
Weekly Availability Calendar
■ Available
■ Busy
■ Partial
MON
24TUE
25WED
26THU
27FRI
28SAT
01SUN
02Click a day to toggle status
Equipment Maintenance Schedule
| Unit | Type | Scheduled | Status |
|---|---|---|---|
| JCB-4 | Oil Change | Mar 05 | SCHEDULED |
| TM-12 | Drum Inspection | Feb 28 | DUE SOON |
| VN-01 | Vibration Check | Mar 15 | OK |
Financial View
Feb 2026 Cycle
Total Net Earnings This Cycle
₹96,450
Settlement Date: Feb 28, 2026 · PROCESSING
Job Earnings
₹84,000
14 jobs · Avg ₹6,000/job
Commission
₹8,400
10% base commission rate
Bonus / Incentives
₹5,000
Zero-delay bonus · Rating bonus
Deductions & Penalties
| Description | Date | Amount |
|---|---|---|
| TDS (2%) | Feb 01 | -₹950 |
| Equipment damage deposit | Feb 10 | -₹0 |
| Late arrival penalty | — | ₹0 (None) |
Total Deductions
-₹950
Settlement Cycle
Monthly settlement · Next release Feb 28
Cycle Progress78%
| Component | Amount |
|---|---|
| Gross Earnings | ₹97,400 |
| Deductions | -₹950 |
| Net Payable | ₹96,450 |
| Released | ₹84,000 |
| Pending | ₹12,450 |
Resource Conflict Alerts
2 Active Alerts
Double Allocation Warning
Unit #JCB-4 has been allocated to both Job #01 (Bridge Sector 7) and Job #05 (Excavation CBD) on Feb 27. Conflict must be resolved by 5:00 PM today.
Reassignment Notification
You have been reassigned from Job #06 (Pipeline East) to Job #07 (Drainage Repair, Block 9) effective tomorrow. Coordinator: Vinay Sharma assigned this change.
Cancellation Notice
Job #08 (Soil Testing, Plot 44) has been cancelled by the client. This job has been removed from your upcoming schedule. Payment for preparation costs will be processed within 3 days.
Performance Metrics
Grade: A+ · Top 5%
Core Metrics
Job Acceptance Rate
96%
On-Time Completion Rate
91%
Customer Rating
4.8 / 5.0
★★★★★
Attendance Score
98%
Delay Record
2 delays
2 delays in last 30 jobs — Within acceptable range
Rejection Count
3 rejections
3 of 145 jobs rejected — Excellent record
Performance Summary
142
Jobs Completed
5.2h
Avg Completion Time
Recent Certifications
🏅
Zero Delay Streak — 30 Days
Verified · Issued Feb 01, 2026
⭐
5-Star Client Satisfaction Badge
Verified · Issued Jan 15, 2026
🔧
Heavy Equipment Operator — Certified
NCVT · Valid until Dec 2027
Warnings / Penalties
🛡️
CLEAN RECORD
No warnings or penalties on file